New turbines:
Seren Energy has knowledge and experience of a wide range of wind turbines,
both new and refurbished, and can suggest which machines which would best suit
your application.
Once
planning permission has been achieved, Seren Energy will take care of the entire
installation process. This includes the studies required by the network operator
to assess exact grid connection requirements, ground conditions report, access
construction, foundations, erection, grid connection and commissioning. We will
also cover the maintenance of the turbine if required.
If you would prefer to project manage the scheme yourself, Seren can act as professional advisors, giving guidance on the more specialist and technical aspects of the process.
Refurbished turbines:
Over the last 5-15
years, ago many wind turbines were installed in
wind turbines down and replace them with larger (1,000kW – 2,500kW)
machines – this is known as ‘re-powering’. So for the same site and the same
number of wind turbines they are now able to generate 4 or 5 times as much
electricity.
A number of 5-10 year old machines are consequently available on the second-hand market. They are re-furbished and have a full service history and were originally designed with a 25 year design life, so have many years worth of generation left in them.
These machines can be installed for about half of the price of a new machine and
usually represent a payback of under 5 years in an area with high wind speeds.
Refurbished wind turbines from a variety of manufacturers are used, including
Vestas, Micon, NTK, Nordtank and Bonus